Where precision
saves lives.

Healthcare construction demands a level of precision that goes beyond any other building type. Infection control, complex mechanical systems, phased delivery around live operations, and strict regulatory compliance are not challenges — they are the baseline.

Radix has delivered over $1.2 billion in healthcare construction across acute care hospitals, ambulatory surgery centers, medical office buildings, and specialty clinics. Our dedicated healthcare team includes project managers and superintendents who have spent their careers in this sector.

We build to FGI Guidelines, NFPA standards, and Joint Commission requirements — and we coordinate seamlessly with your clinical, facilities, and infection control teams from day one.

$1.2B+
Healthcare Construction Delivered
47
Healthcare Projects Completed
100%
Joint Commission Compliance Rate
0
Infection Control Incidents
Facility Types

Every care setting, every complexity.

Acute Care Hospitals
Ambulatory Surgery
Medical Office Buildings
Research & Lab Facilities
Behavioral Health
Cancer Treatment Centers
Technical Capabilities

Built for the most demanding environments.

Healthcare facilities require systems integration at a level no other building type demands. Our team self-performs critical coordination and manages every trade to the same exacting standard.

HVAC & Infection Control

  • ICRA / PCRA compliance planning
  • Negative pressure isolation rooms
  • HEPA filtration systems
  • Pressurization monitoring
  • Air change rate verification

Electrical & Power

  • Essential electrical systems
  • UPS and generator integration
  • Medical gas systems
  • Nurse call & intercom
  • EMR / IT infrastructure

Plumbing & Medical Gas

  • Medical gas piping (O₂, N₂O, vacuum)
  • Sterile processing systems
  • Deionized water systems
  • Backflow prevention
  • ASSE 1070 compliance

Regulatory & Compliance

  • FGI Guidelines compliance
  • Joint Commission readiness
  • NFPA 101 Life Safety
  • ADA / accessibility
  • State health department approval
Our Healthcare Process

Zero disruption.
Zero incidents.

01

Infection Control Risk Assessment

Before a single wall is opened, our team conducts a full ICRA with your Infection Prevention team, establishing containment zones, traffic patterns, and monitoring protocols.

02

Phased Construction Planning

We sequence work to maintain full operational capacity in adjacent areas, using temporary barriers, HEPA filtration, and negative pressure enclosures.

03

Systems Commissioning

Every mechanical, electrical, and plumbing system is commissioned and tested before occupancy — with full documentation for Joint Commission review.

04

Activation & Transition Support

We stay engaged through your activation process, providing on-site support during move-in and punch-list resolution within 30 days of substantial completion.

Healthcare campus
Case Studies

Proven performance in the field.

Summit Medical Center
Healthcare

Summit Medical Center

Summit Health System

Phoenix, AZ
2023
$215M
480,000 SF

A 320-bed acute care hospital with Level II trauma center, 12 operating suites, and a dedicated cancer treatment wing. Built to FGI Guidelines with full infection control protocols throughout construction.

Project Highlights
  • Delivered 3 weeks ahead of schedule
  • Zero ICRA violations during 26-month construction
  • LEED Silver certified
  • Joint Commission accreditation achieved on first survey
  • 12 operating suites commissioned simultaneously
Riverside Medical Office Building
Healthcare

Riverside Medical Office Building

Riverside Health Partners

Albuquerque, NM
2021
$54M
180,000 SF

A six-story medical office building with an integrated imaging center, ambulatory surgery suite, and 400-space structured parking — delivered on a fully occupied campus.

Project Highlights
  • Zero disruption to adjacent occupied facilities
  • Phased delivery of 3 floors while construction continued
  • MRI shielding installed within 0.5% of specification
  • Medical gas systems commissioned in 4 days
  • Opened on budget after 18-month schedule
Common Questions

What healthcare
owners ask us.